Location:

158 Hudson Street, NJ, Usa

Duration:

3 Months

Square Footage:

601 West

Project Value:

$1,600.000

From Data Center to Dream Space: A 50,000 Sq Ft Transformation

Big Apple successfully transformed a 50,000-square-foot data center into a state-of-the-art amenities floor, featuring sports courts, a game room, and a lounge. Completed in just 3 months, the project was delivered on time, within budget, and with top-quality craftsmanship by our 145-member team.

Successfully completed a transformative project at Plaza 5 Harborside in New Jersey, where we disconnected a 50,000-square-foot data center, removing all high-voltage and cooling systems. We then built a new amenities floor featuring a basketball court, pickleball and shuffleboard courts, a game room, golf simulators, a bar lounge, and restrooms. The project included new electrical and sprinkler systems, custom ductwork, and the installation of two 35-ton HVAC units.

Preparation Phase

We meticulously planned and prepared for the project, working closely with the building engineer and conducting detailed scans of the building. This thorough approach ensured that our work aligned perfectly with the existing blueprints, setting the stage for a seamless transformation.

Technical Characteristics

In this phase, we safely and efficiently decommissioned the 50,000 sq ft data center. Our team expertly removed all high-voltage and cooling systems, preparing the site for the next stage of development.

Construction Technology

We utilized our AI-VR technology to ensure precision and efficiency throughout the project. This cutting-edge tech allowed us to create a powerful database, perform detailed scans, and track every step of the project, both before and after construction. By integrating these advanced tools, we ensured that every aspect, from custom ductwork to HVAC installations, was executed to the highest standards.

Benefits to Society

We brought the project to completion with a focus on excellence. The construction of sports courts, a game room, lounge areas, and restrooms was executed with meticulous attention to detail. After rigorous quality checks, the new amenities floor was delivered on time and within the $1.4 million budget, reflecting our commitment to high-quality results.